DCM Canada is one of Ontario's largest structural steel erection firms. Drawing on the accumulated experience of its key personnel and the latest in computer aided design, detailing and scheduling software, the company is poised to dramatically increase its share in the structural detailing, crane rental and curtain wall markets. Through its affiliated companies, The DAVIS GROUP, DCM is capable of handling a wide variety of projects including heavy industrial, commercial high-rise, bridges and architectural structures. The company also offers construction services in industrial and commercial retrofits and rehabilitations. In emergency or critical situations. our comprehensive network of suppliers and affiliates provides our clients with prompt and effective solutions.
 


New from THE DAVIS GROUP:
Internal Climbing Tower Crane. Click here for video


 

LESTER B. PEARSON INTERNATIONAL AIRPORT, Toronto, Ontario

 

Steel Erection and Modification in Phases as shown Below:

 



Erected under an existing roof
 

Intermediate Steel Levels I, II & III (7,000 ton)
The Intermediate Steel involved the erection of new floor and bracing members under an existing roof structure resulting in close quarter work requiring precise sequencing and thorough coordination with civil and finishing trades. DCM Erectors' provision of Work Around Solutions to access and trade conflicts enabled the Construction Manager to achieve the benefits of their unorthodox and high-risk construction schedule. The required Customer Changes necessary to achieve occupancy were handled expeditiously in the field thereby greatly assisting the Construction Manager in the maintenance of the planned schedule.

 



Complicated Pick
 

Liner Steel & Apron Tower (9,500 ton)
The Liner Steel & Apron Tower contract included the erection of a portion of the New Terminal Building that would eventually become the Departure Lounges, Security and Baggage Handling facilities. The construction of the Apron Tower, eventually housing the Ground Traffic Control Operations, consisted of six full floor lifts that were assembled off site and transported to the erection position during Windows of Opportunity in the Air Traffic Operations. The installation of Architecturally Exposed Structural Steel (AESS) formed a significant portion of the Liner Steel Contract.




Need many pieces
to make 1,000 tons
 

Canopy Steel & Level III Reinforcing (1,000 ton)
The reinforcing of the existing 3rd Floor amidst the intense finishing trades activities required all of DCM Erectors logistical and coordination ability in order to help the GTAA Construction Management team meet its schedule goals. Erection of the Kiosk and Canopy Steel over and around finished Terrazzo Floors required elaborate rigging and welding techniques. The final product, predominantly Architectural Exposed Structural Steel, eloquently proves DCM Erectors capabilities in the Miscellaneousl and High End Ornamental Steel area.

For more infomation click here to see complete project list.